Survey using Latest Techniques
Field Survey using Total Station for base map preparation and TP scheme after fixing control points and traversing for Villages in Ahmedabad.
Funding Agency: -
Location: Ahmedabad (Gujarat, India)
Summary of work completed in the AUDA area by the firm is as under:-
Sr No
|
Name of Village
|
Village area in
( Ha)
|
1
|
Rampura
|
388.06
|
2
|
Bhavanpura
|
342.54
|
3
|
Andej
|
1509.88
|
4
|
Vadavi
|
940.76
|
5
|
Aadrej
|
1578.23
|
6
|
Vamaj
|
1709.60
|
7
|
Kanjari
|
1069.63
|
8
|
Fuletra
|
1017.63
|
9
|
Jaloda
|
1118.76
|
|
Total
|
9675.09
|
|
Actual Services provided by the Firm
- Fixing of Traverse and control point in the villages.
- Total station surveys for entire area with all surface features, recording of field boundaries existing on the field, preparation of detailed base maps.
- Collection of revenue records such as revenue maps, revenue holding details from settlement department, Tippans, Plot books etc.
- Geo-referencing and superimposition of revenue details over surveyed features.
- Comparison statements of revenue details and actual measurement works.
|
- Works of Milawani, printing of maps on paper and films on scale of 1 cm : 4m.