Route Mapping, ROU Acquisition and Geotechnical Investigation work for "Kandla Gorakhpur LPG Pipeline" (Bhopal-Unnao section including spur line in Madhya Pradesh and Uttar Pradesh State) (569 km Length)
Funding Agency: Indian Oil Corporation Limited (IOCL)
Location: Uttar Pradesh and Madhya Pradesh
The proposed Mundra-Mithi Rohar LPG Pipeline (MMPL) is linked with Kandla-Gorakhpur LPG Pipeline (KGPL). The proposed pipeline route lengths for Kandla-Gorakhpur LPG Pipeline (KGPL) is 2760 km approximately and for Mundra-Mithi Rohar LPG Pipeline (MMPL) is 94 km approximately. N.K. Buildcon Pvt. Ltd. was awarded the work of Bhopal to Unnao Section (569 km).
Actual Services provided by the Firm
• Reconnaissance Survey • Detailed Engineering Survey • Population Density Index Survey • Soil Resistivity Survey • Soil Chemical Analysis Survey • Soil Stratification Survey • Data Generation Survey • River hydrological data collection/ generation • Cadastral Survey • Technical Report Preparation • Topographical survey at station locations • Geotechnical investigation at Station locations and HDD crossing locations • Providing services for establishing Right of User (ROU) in Right of Way (ROW) • Obtaining approvals/permissions from the respective State/Central and other Statutory Authorities for various crossings of the entire pipeline route.