Techno-Economic Feasibility Study of Ataria Irrigation Project. (Project Cost : INR 1900 Million)
Funding Agency: NVDA
Location: Madhya Pradesh
Atariya project is one of the main projects on Narmda Basin in MP state as per the master plan of the Narmada River, the Atariya Project is planned on River Hiren, a tributary of Narmada, project aims at irrigating more than 20000 Ha of irrigation through irrigation with the feeder canal to the Satna branch canal and independent command downstream of the project.
Actual Services provided by the Firm
For establishing Techno economic feasibility of Ataria Project. (1) Irrigation project (a) with canal head power house (b) With power generation at development stage of irrigation (2) Purely hydel power project :- 1. Collection of data available with department. 2. Obtaining site clearance from appropriate authority for survey & investigation 3. Collection of additional data/information from different Departments / Agencies required for preparation of Techno economic feasibility report. 4. Review of Survey & Investigation data available with the department. 5. Identification of additional preliminary surveys, Geo technical and Geological investigations necessary to establish Techno economic feasibility of Project. 6. Conducting preliminary Surveys, Geological and Geotechnical investigations necessary to establish Techno economic feasibility of Project. 7. Preparation of draft Techno economic feasibility report and its submission to Engineer-in-charge in 5 copies for approval. 8. Providing information / additional data required if any for approval of Techno economic feasibility report from competent authority. 9. On approval, submission of approved final Techno economic feasibility report in 20 copies. For preparation of Detailed Project Report for Ataria Project (1) Irrigation project (a) with canal head power house (b) With power generation at development stage of irrigation (2) Purely hydel power project :- 10. Identification of detailed Surveys, Geological and Geo-technical investigations required for preparation of Detailed Project Report. 11. To carryout detailed Surveys, Geological and Geotechnical investigations required for preparation of Detailed Project Report. 12. Project planning, designing, preparation of drawings, estimates etc. for different components of project and construction planning for preparation of DPR. 13. Preparation and submission of draft Detailed Project report to Engineer-in-charge in 5 copies for approval from competent authority. 14. Providing information / additional data required if any for approval of Detailed Project Report from competent authority. 15. On approval, submission of final Detailed Project Report in 50 copies. 16. Obtaining clearance from different directorates of central electricity authority & Central Water Commission like Directorates of Hydrology, Irrigation Planning, Gate designs, Embankment designs, Canal designs, Concrete and Masonry dam designs, Construction Machinery consultancy, Foundation Engineering and special analysis, Cost appraisal, Interstate matters etc. including providing any additional data / information required for clearance from respective directorates. 17. Collection of Data/Information from different Departments/Agencies for Preparation of ‘Rehabilitation and Resettlement plans’, ‘Catchment Area Treatment Plan’, Command Area Development plan’, Report on ‘Base line conditions’, ‘Environment Impact Assessment Plan’, ‘Environment Management Plan’, ‘Health Action plan’ etc. and preparing above plans required for obtaining approval form different Ministries of GOI / GOMP. 18. Obtaining approvals from different Ministries of GOI / GOMP like Ministry of Environment and Forest, Ministry of Tribal Affairs etc. including providing any additional information / data required for approval from respective Ministry of GOI / GOMP. 19. Obtaining Investment Clearance from Planning Commission GOI/GOMP including providing any additional information / data required for investment clearance from Planning Commission/State Planning Board