Sewerage scheme for Left Out / Newly Developed Area of Jodhpur Town (Project Cost : INR 6840 Million)
Funding Agency: Government of India
Location: Jodhpur
To prepare Detailed Project Report for Sewerage System for left out / newly developed / out skirt areas of Jodhpur city and corresponding sewage treatment plants as per requirement, feasibility and demand.
Actual Services provided by the Firm
? Detailed engineering survey for detailed base maps preparation using high end total station for 163.94 sqkm area covering approximately 1459 km road length in entire town, this including establishing control, capturing ground features, L-Section and Cross Sections, undertaking BBT tests, water sample analysis etc. Preparation of maps on GIS based layer system. ? Population projections, Techno-Economic feasibility studies (for design horizon of 2044 for a population of approximately 15.70 Lacs) for laying of the sewer lines, study of the previous system and capacity of the sewerage systems, identifications of the gaps, feasibility and detailed planning of the sewerage system for 1459 km of length. The proposals were framed zone wise; it included zone wise conveyance planning, designing and treatment of wastewater. All the drawings, design were prepared using latest software modules. The proposals included detailed levels for laying of lines, earth work, filling, chambers, lines calculation and estimation of quantities of different items for estimates preparations. ? Rendering services of JMC for assistance during execution of work for any changes in drawings / Designs / Quality control with reference to DPR project components. ? Development of STP based on conventional activated sludge process using fixed film attached growth system as an option of secondary treatment. Capacity of STP 196 MLD. ? Preparation of estimate and tender documents for the entire scheme. Sewer lines proposed for 1459 km of length was for Rs. 564.25 Cr. excluding cost of STP of 196 MLD capacity. ? Cost of the Project is Rs. 684.03 Crores.