Projects

Advance Mapping & GIS

GIS-based Master Plan Formulation for Cluster-6 having Total 5 Nos. of Cities in Uttar Pradesh under AMRUT (Shahjahanpur, Badaun, Sitapur, Hardoi, Farukkhabad-Fatehgarh)

GIS-based Master Plan Formulation for Cluster-6 having Total 5 Nos. of Cities in Uttar Pradesh under AMRUT (Etah, Etawah, Kasganj, Mainpuri, Hathras)

Catchment Area Treatment Plan including Micro-level Survey and its clearance from MOEF for Parwan Major Irrigation cum Drinking Water Supply Project. (8200 Sq.km) (Project Cost : INR 4290 Million)

Mapping of 11 Places (Package 1) from Satellite Images and Survey using Total Station for Utilities and Contours. (Hospet, Sira, Chikballapur, Robertsonpet, Chitradurg, Chintamani, Tiptur, Gangawati, Koppal, Haveri)

Design Consultancy Services (DCS) for Rejuvenation and Conservation of Lakes under National Lake Conservation Plan (NLCP) under for Package; NLCP/DCS-1 (Gap Sagar (Dungarpur), Daylab Talab (Banswara), Goverdhan Sagar and Udai Sagar (Udaipur), Rajsamand Lake (Rajsamand) Project Cost : Rs. 150 Cr.

Preparation of Zonal Development Plan for Abu Road. Project Area : 15904 ha

Consultancy Services for Conducting River Cross Section and Embankment Asset Survey in Rapti River Basin.

Topographical & Cadastral survey of the project area, detailed study of the project area system and identification of the problems & Redesigning of Irrigation and Drainage systems of Haidergarh branch canal (Km 22.98 to tail) system, covering GCA of approx 0.98 lac ha in Gomti - Sai basin, situated in Barabanki, Sultanpur & Raibarely district in Uttar Pradesh. Project Cost : 1300 Million

Detailed Route Survey of Barmer-Palanpur Pipeline Project

Detailed Engineering Survey, Cadastral Survey and Miscellaneous Works for Bina-Panki (Kanpur) Multiproduct Petroleum Products Pipeline Project. (Pipeline Length : 360 km)

Irrigation Studies of Command Area in Nepalese Territory of Sapta Kosi High Dam Multi Purpose Project and Sun Kosi Storage-cum-Diversion Scheme in Nepal.

Pre-Engg, Survey, ROU Acquisition & Obtaining Statutory Clearance / Permission for Projects in Onshore, Assets Under Separate 03-Years Rate Contracts for Western Region (Gujarat & Rajasthan) (Pipeline Length Approx. : 4000 km)